August 3, 2018•
The PHHS Boiler Building at the Sierra Institute uses CrossLam CLT and Glulam Plus across the design and construction of both the walls and the floors.
Follow the latest news from Structurlam.
The PHHS Boiler Building at the Sierra Institute uses CrossLam CLT and Glulam Plus across the design and construction of both the walls and the floors.
Called Wilp Sim Aks in the Nisga’a language, or “House of Clear Water”, this water treatment facility is state-of-the-art. The building is 2,600-square feet and features mass timber framing and cedar siding.
The Garibaldi Fire Hall is an environmentally friendly, leading edge building with a residential suite constructed above the fire station using cross-laminated timber. There are a number of sustainability benefits including the use of local BC materials and manufacturing, renewable resource product supporting BC Wood First legislation, and significantly reduced energy consumption thanks to an increased …
The Capilano Filtration Plant holds LEED certification, designating it as an international green building. Glulam, combined with steel, brings a modern and sleek design to the largest filtration plant in Canada.